general contractor, nevada general contractor, civil design, design assist, construction management at risk, design build, agency construction manager, preconstruction services, construction services, construction scheduling, construction partnering, construction safety, project management, construction management
 
about clark & sullivan
products & services
current bids
projects
current projects
what's new
contact us
clark & sullivan home page
 
 
 
Current Bids - Please click on the project you are interested in to see more detailed information about each project.
 
To save documents to your computer: Right click on the desired document. Left Click on "save target as" You are now able to choose where you would like to save the document on your computer. Note where you are saving the documents (ie "My Documents" , "Desktop") Click "Save".


Project Title:San Juan HS Media (Inc1) & Performing Arts (Inc2) Building, Citrus Heights CA
Bid Date:8/19/2010
Bid Time:2:00 p.m.
Estimator:Ted Foor
Coordinator:Kate Baker
Notes: Remodeling of existing 9,422 sf of Media Building and 12,747 sf of Performing Arts Building. Project includes but not limited to: demolition of existing windows, doors, ceiling, walls, plumbing, electrical fixtures, HVAC, floor finishes. New cabinets, skylights, interior finishes, windows, doors, walls, plumbing and electrical fixtures, audio/visual equipment, ceilings. Pre job walk will be held on Aug 4th and on Aug 5th at 2pm at 7551 Greenback Lane, Citrus Heights,CA. RFI cut off date is August 10th, 2pm.Carpenter trades should be Signitory to Carpenters Union.

PLANS & SPECIFICATIONS ARE AVAILABLE FOR DOWNLOAD VIA FTP, FOR AN INSTRUCTIONAL VIDEO ON HOW TO ACCESS OUR FTP PLEASE SEE:

FTP Instructional Video on YouTube

Scope of the project:
  • Table of Contents.pdf - 244.23KB
  • Project Manual.pdf - 6.48MB
  • Division 01 General Requirements.pdf - 5.28MB
  • Division 02 Site Work.pdf - 6.91MB
  • Division 03 Concrete.pdf - 4.6MB
  • Division 04 Masonry.pdf - 569.09KB
  • Division 05 Metals.pdf - 4.11MB
  • Division 06 Wood and Plastics.pdf - 2.49MB
  • Division 07 Thermal and Moisture Protection.pdf - 8.12MB
  • Division 08 Doors and Windows.pdf - 5.6MB
  • Division 09 Finishes.pdf - 11.77MB
  • Division 10 Specialties.pdf - 2.52MB
  • Division 11 Equipment.pdf - 5.2MB
  • Division 12 Furnishings.pdf - 1.98MB
  • Division 13 Special Construction.pdf - 660.74KB
  • Division 14 Conveying Systems.pdf - 658.39KB
  • Division 15 Mechanical.pdf - 6.27MB
  • Division 16 Electrical.pdf - 8.84MB
  • Division 17 Low Voltage.pdf - 4MB
  • Subcontract Agreement.pdf - 242.12KB
  • Subcontractor_Prequalification_Form.pdf - 248.21KB
  • Proposal Form.doc - 73.5KB
  • SJHS P5 Asbestos General Req 032609 Part I.pdf - 2.87MB
  • SJHS P5 Asbestos General Req 032609 Part II.pdf - 2.59MB
  • Bulk Sampling Report 080509 w Attachments.pdf - 1.1MB
  • Arborist Report July 3 2008 1 of 2.pdf - 8.4MB
  • Arborist Report July 3 2008 2 of 2.pdf - 8.34MB
  • OnSite Guidelines.pdf - 248.67KB
  • Instructions to Bidders.pdf - 409.19KB
  • Proposal Schedule.pdf - 12.31KB
  • Preliminary Schedule.pdf - 56.32KB
  • Prebid Job Walk Sign in Sheets.pdf - 137.35KB

  • Addenda Documents:
  • Addendum No.1 part 1 Inc.1.pdf - 12.48MB
  • Addendum No.1 part 2 Inc.1.pdf - 6.8MB
  • Addendum No.2 Inc 1.pdf - 472.46KB
  • Addendum No.1 Inc.2.pdf - 471.97KB
  • Pre-Bid RFI Response Memo.pdf - 6.02MB

  •