Clark/Sullivan Construction

CHP Crescent City Replacement Facility

  • 2-Edited

    2-Edited

  • 14-Edited

    14-Edited

  • 20-Edited

    20-Edited

  • 10-Edited

    10-Edited

  • 22-Edited

    22-Edited

  • 7-Edited

    7-Edited

  • 18-Edited

    18-Edited

  • 8-Edited

    8-Edited

  • 12-Edited-1.jpeg

    12-Edited-1.jpeg

  • 13-Edited.jpeg

    13-Edited.jpeg

Client

CA Department of General Services

Architect

Arrington Watkins Architects

Project Value

$16.8 Million

Delivery Method

Design Build

Category

Justice/ Correctional

Clark/Sullivan Construction and Broward Builders (C/S Broward) teamed-up as a joint venture on this design-build project for the California Department of General Services / California Highway Patrol.

The campus includes:

  • Administration + Patrol Building
  • Vehicle Maintenance Areas / Auto Shop with 2 Lifts
  • Evidence Storage
  • Defense Tactical Training + Locker Rooms
  • 148 ft. Communications Tower
  • Vehicle Fueling Station

LEED Silver Energy Efficiency Highlights:

  • Improved wall insulation and roof insulation, along with
  • Efficient HVAC equipment and LED lighting (interior and exterior) has allowed the project to achieve an energy cost savings of 24.3% above ASHRAE standards.

With design partners Arrington Watkins Architects, the team brought this CHP Replacement Facility project to life despite record-setting rainfall and unforeseen conditions.