Clark/Sullivan Construction

Martis Valley Education Fund Admin Building

  • CSTruckeeAdmin02

    CSTruckeeAdmin02

  • CSTruckeeAdmin01

    CSTruckeeAdmin01

  • CSTruckeeAdmin03

    CSTruckeeAdmin03

  • CSTruckeeAdmin04

    CSTruckeeAdmin04

  • CSTruckeeAdmin07

    CSTruckeeAdmin07

  • CSTruckeeAdmin08

    CSTruckeeAdmin08

  • CSTruckeeAdmin06

    CSTruckeeAdmin06

Client

Martis Valley Education Fund

Architect

Pfau Long Architecture & Ward-Young Architecture

Project Value

$5 Million

Delivery Method

Design Build

Category

K-12 Education

Using the design-build delivery method, C/S, Pfau Long Architecture and Ward-Young Architecture (collaborating architect) teamed-up to deliver a 7,125 sf facility that can serve the immediate needs of the community, but also has potential for significant growth in the near future as a school campus that emphasizes indoor-outdoor learning.

In order to incorporate the “Tahoe Aesthetics” that the owner desired, the design-assist team chose to use Cross-Laminated Timber, an innovative engineered system, for its efficiency, beauty and strength.