United Brotherhood of Carpenters & Joiners International Training Center Dormitory Construction

Las Vegas, NV
$25 Million
Construction Manager at Risk (CMAR)
Higher Education

Clark/Sullivan Construction completed phase 3 to the Carpenters’ Dormitory in their International Training Center using CMAR delivery. The center consists of 165 short term lodging units built on 89,064 square feet. This 6-story expansion is located at the south end of the existing facility. It was completed on-time for the Guaranteed

After many years of being signatory to United Brotherhood of Carpenters & Joiners, C/S had the honor of working directly with International President Doug McCarron to ensure the dormitory was a flag ship project.

The project included expansion of the central plant, additional dormitory rooms, and spaces for administration offices, recreation areas, mechanical utility, an executive gym and gift shop, along with expanded laundry facilities. The existing swimming pool equipment was relocated. The construction system consisted of load bearing CMU walls with cast in place concrete floor and roof slabs. A single ply roof membrane over tapered rigid insulation was installed over the concrete or metal deck. n

Client
United Brotherhood of Carpenters & Joiners of America
Architect
JMA Architecture
Location
Las Vegas, NV
Project Value
$25 Million
Delivery Method
Construction Manager at Risk (CMAR)
Categories
Higher Education